Case Studies
Rail Control Centre V&V
When Invensys Rail was commissioned to handle a line upgrade project by German rail company Deutsche Bahn AG, they asked Zircon to undertake the Verification & Validation aspects of the job. Despite a number of challenges everything was successfully completed and implemented on time, and Invensys Rail was full of praise for the way that Zircon approached this awkward task.
Download Case Study
Tagged with: Rail Testing/Assurance
Reporting Revamp
Zircon recently worked with Hyder Consulting to redesign a crucial spreadsheet for the Highways Agency (HA). Despite a number of difficulties and a very tight time frame, Zircon successfully delivered a solution, enabling the HA to create higher quality reports with greater ease and efficiency.
Download Case Study
Tagged with: Development Traffic/Travel
Train Carried Data Logger
Zircon recently worked with Invensys Rail to develop an on-train data logger and decoder for the upgrade of London Underground’s Victoria Line. This enabled them to successfully get a new control and signalling system into service, within a tight time frame.
Download Case Study
Tagged with: Development Rail Test Solutions
VIH Certification Package
Zircon recently helped WSP Intelligent Transport Systems to develop a Video Information Highway Certification Package (VIH CP) that will be used by the Highways Agency to ensure that new Video Clients and Television Base Stations comply with the agency’s VIH specifications.
Download Case Study
Tagged with: Development Test Solutions Testing/Assurance Traffic/Travel
